Portfolio 

0 1 9 8 0 8 2 0

 m2

Doka 2

Client/ End user: Umdasch Immobilien Gmbh (Osterreich)

GBA: 6 000 m2

Location: Dmitrov district, Moscow region

Project details: Construction of production, repair and warehousing complex of DOKA formwork structures. The project is located in Orudievo industrial park in Dmitrov district of Moscow region.

Our role: Concept, stage P and Working design, author supervision.

Project implementation period: 2013-2015.

Arika 1

Client/ End user: Arika Investments B.V.

GBA: 23 100 m2

Location: Khotkovo, Sergiev-Posad district, Moscow region

Project details: Construction of  polypropylene pipes plant.

Our role: Concept, stage P and Working design, author supervision

Project implementation period: 2013-2015.

Challengies and achievements: Technically very complicated and challenging building

Baker Hughes 2

Client/ End user: Baker Hughes (USA)

GBA: 31 000 m2

Location: Tumen

Project details: Construction of oil submersible cable plant for Baker Hughes company (USA). The opening ceremony took place in January 2014. The plant is built in the image and likeness of the factory in Oklahoma, USA. It will become unique for Russia as for cable production special type of rubber is used - rubber based on DL90 mixture, which has unique insulation characteristics and ensures long lifecycle of the cable in oil well. The plant produces two types cable: plastic and rubber with lead coat. The manufacturing process is fully automated, the production is environmentally friendly.  Total GBA is 31 000 m2, including office area and training center.

Our role: Concept, stage P and Working design, author supervision

Project implementation period: 2012-2013.

Challengies and achievements: Technically very complicated, especially in terms of integration of process part into the existing building, which is not in a good condition

Palych 1

Client/ End user: Palych Products LLC

GBA: 4 500 m2

Location: Reutov, Moscow region

Project details: Construction of food production shop for confectionery products of "U Palycha" trade mark.

Our role: Development of stage P and Working design for MEP systems and technological section

Project implementation period:2012

KSB 1

Client/ End user: KSB (Germany)

GBA: 4 900 m2

Location: Indigo Industrial Park, Nikolo-Khovanskoye, Leninsky district, Moscow region

Project details: Construction of service, maintenance and warehousing complex for pump units of KSB corporation (Germany) in Indigo industrial park in New Moscow territory. 

KSB corporation is a world famous producer of pump equipment and pipe fittings for various industries, including chemical, oil, mining, food, pharma sectors, as well as civil construction and atomic power stations.

Our role: Concept, stage P and Working design, author supervision

Project implementation period: 2012-2013.